检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马玉敏[1] 樊留群[2] 张为民[2] 张浩[1]
机构地区:[1]同济大学CIMS研究中心,上海200092 [2]同济大学中德学院,上海200092
出 处:《系统仿真学报》2007年第19期4548-4552,共5页Journal of System Simulation
基 金:中德政府项目(2002DFG00027)
摘 要:车间作业排序是一个NP-Hard问题,针对其复杂性和难以求解的特点,提出了采用仿真与优化算法相结合的求解方法。首先,建立了车间作业计划仿真优化系统的框架,采用UML对系统进行建模分析,并在仿真软件eM-Plant中映射实现,应用遗传算法优化模型关键参数,实现最优排序,最后示例说明该系统。该方法简单可行,为解决这类复杂问题提供了一条捷径。A job-shop scheduling problem is proved to be a NP-hard problem. Considering its complexity and its difficulty in solving, a solution that combining simulation and optimization algorithms was provided. A framework of job-shop scheduling simulation optimization system was suggested. The system was analyzed using UML mapped in eM-Plant simulation software, and its model parameters were optimized through genetic algorithm (GA) to get the ideal scheduling. An example was given to explain the system, This solution is easy and feasible, and provides a shortcut for this kind of complicated problem.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229