南京联强国际大厦深基坑支护设计与监测  被引量:13

Design and Monitoring of Deep Foundation Pit in Nanjing Lianqiang International Building

在线阅读下载全文

作  者:赵忠岩[1] 石汉生[1] 刘翔 朱远辉[1] 周洪波[1] 

机构地区:[1]广东省建筑设计研究院,广州510010 [2]南京南大岩土工程技术有限公司,210086

出  处:《建筑结构》2007年第9期115-117,140,共4页Building Structure

摘  要:南京联强国际大厦深基坑支护工程基坑深14.9m,上部采用复合土钉墙(深层搅拌桩加土钉)支护,下部采用钻孔灌注桩加两层钢筋混凝土支撑进行支护,一排三轴深层搅拌桩止水。通过对支护结构体系的计算和基坑监测结果分析得出:基坑支护桩桩顶水平位移时空效应明显;桩身弯矩实测值介于水土合算值与分算值之间,水土分算比较安全;基坑开挖过程中必须做好坑壁防渗措施,以保护基坑周围的道路或建筑物。A 14.9m deep foundation pit in Nanjing Lianqiang International Building, using composite soil-nailed support upside and drilling-grouting pile with two concrete frames underside, is designed and monitored. The calculation and monitoring results show that the space-time effect of foundation pit shoring top level displacement is obvious, the test value of pole body's bending moment is between the calculating values of estimating the water and the earth pressures together and separately, and the latter is safer. Some measures must be taken to prevent the leakage of the pit wall. These conclusions are useful for design and monitoring of the similar foundation pit.

关 键 词:深基坑 钻孔灌注桩 极限平衡法 位移 

分 类 号:TU942[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象