检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈尚发[1]
机构地区:[1]浙江长兴发电有限责任公司,浙江省长兴市313100
出 处:《电力建设》2007年第10期67-70,共4页Electric Power Construction
摘 要:抽水蓄能电站是电力系统不断扩大过程中所产生的一种发电形式,其作用是保证电力系统安全稳定运行和灵活经济调度。抽水蓄能电站电气主接线方式的选择,应综合考虑抽水蓄能电站在电力系统中所处的地位、机组台数、容量大小、启动方式、自然条件等不同因素的影响,进行全面的经济、技术比较,以及可靠性评估和优化设计论证。Pumped-storage power station is a new type of power generation during the process of power system expanding. Its function is to keep safe and reliable power system operation, as well as flexible and economical dispatching. The main wiringselection of pumped-storage power station should consider different factors, such as the status of the station in power system, number of units, capacity, startup method, natural conditions, etc., and perform complete economic and technical comparisons, as well as reliability assessment and optimum design demonstration.
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222