检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:冯迅[1] 龚传利[1] 史邦文[2] 郭鹏慧[2]
机构地区:[1]中国水利水电科学研究院自动化所,北京市100038 [2]黄河上游水电开发有限责任公司集控管理中心,青海省西宁市810008
出 处:《水电自动化与大坝监测》2007年第5期10-13,共4页HYDROPOWER AUTOMATION AND DAM MONITORING
摘 要:介绍了黄河上游梯级水电站调度自动化系统中自动发电控制(AGC)优化策略,以梯级消耗水能最小为目标函数,根据各水电站机组特性曲线,使用分阶段动态规划算法完成整个梯级系统的有功分配优化。该优化策略成功应用于黄河上游龙羊峡、李家峡、公伯峡梯级水电站,实践证明,算法可行且达到了预期优化目标。The AGC optimization strategy for the dispatching automation system of the cascade hydropower stations on the upper Yellow River is introduced in detail. A model, with minimum cascade hydroenergy as its objective function, is established to optimize the power distribution of the whole cascade system by grading dynamic programming, according to the characteristic curves of the generators. The optimization strategy is applied to Longyangxia, Lijiaxia and Gongboxia cascade stations. The method is proved feasible and effective.
关 键 词:梯级水电站 调度自动化系统 自动发电控制 动态规划
分 类 号:TV736[水利工程—水利水电工程] TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222