检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]淮南矿业集团安装工程分公司,安徽淮南232001 [2]淮南职业技术学院,安徽淮南232001
出 处:《淮南职业技术学院学报》2007年第3期13-15,共3页Journal of Huainan Vocational Technical College
摘 要:加强矿井综采工作机电设备的安装拆除速度,对于提高矿井的生产效率、提高设备利用率有很重要的意义,随着矿井大功率采煤设备的应用,采场接替频繁,综采工作面机电设备的安装和拆除成了制约矿井生产的薄弱环节,为提高综采工作面机电设备的安装与拆除速度提供了可供参考思路。Increasing speed of assembling and removing of mechanical and electrical equipments in fully mechanized mining face has the importance for raising efficiency of mining production. By the application of big - powering equipments and frequent replacement in caving mining face, the assembling and removing in fully mecha- nized mining face becomes the weak links of mining production. This essay provides the consult training of thoughts about increasing the speed of assembling and removing of mechanical and electrical equipments in fully mechanized mining face.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.141.40.192