检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁大桥局集团第四工程有限公司,江苏南京210031
出 处:《桥梁建设》2007年第A02期28-30,35,共4页Bridge Construction
摘 要:苏通大桥辅桥为(140+268+140)m三向预应力混凝土连续刚构,主跨跨度大,施工、控制难度高,针对该桥特点,综合介绍大跨度连续刚构施工工艺以及主要施工技术难点和施工技术控制措施,对类似桥梁的施工起到借鉴作用。The auxiliary bridge of Sutong Bridge is a concrete continuous rigid-frame structure of three-way prestressing with span arrangement (140+268+ 140) m and the main span of the bridge is long, the construction and construction control are difficult. In the light of the characteristics of the bridge, this paper describes in a summarization way the construction technology, principal construction technical difficulties and technical control measures of the long span rigid-frame structure. The descriptions in the paper may serve as reference to the construction of similar bridges.
分 类 号:U448.23[建筑科学—桥梁与隧道工程] U445[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15