检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]江西省电力公司调度中心,江西南昌330077
出 处:《华中电力》2007年第5期10-12,24,共4页Central China Electric Power
摘 要:介绍了可用率、投运率、调节方向合格率、调节精度合格率、综合投运率等确定性指标,并用这些性能指标对AGC机组提供的辅助服务进行评价,给出了应用实例,对AGC主站控制策略的调整也提出了建议。In this paper, some deterministic performance indices including the unit commitment rate, the unit turn out for work rate, the unit adjusting direction acceptable rate, the unit adjusting precision elig-ibitity rate and the combinational unit turn out for work rate consisting of the aforementioned last three indices have been proposed. Furthermore, these performauce indices are applied to evaluate the auxiliary service provided by AGC units. The corresponding case studies are made and some comments and suggestions on the adjustment of AGC control strategy are presented as well.
分 类 号:TM711[电气工程—电力系统及自动化] TM76
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.219.203.214