水电站无压尾水洞引风热湿交换特性的现场测试  被引量:5

Field test on heat and moisture transfer performance of tailrace tunnel ventilation in a hydropower station

在线阅读下载全文

作  者:余延顺[1] 王政[2] 石文星[1] 李先庭[1] 

机构地区:[1]清华大学 [2]中国水电顾问集团成都勘测设计研究院

出  处:《暖通空调》2007年第10期111-115,共5页Heating Ventilating & Air Conditioning

摘  要:对映秀湾水电站无压尾水洞引风过程中的室外空气温湿度、尾水洞出口空气温湿度、尾水进出口温度、引风量等参数进行了测试。测试结果表明,夏季运行时无压尾水洞对引入空气有良好的降温除湿效果;在无压尾水洞足够长的条件下,尾水洞末端引风参数主要受尾水温度的影响,而受室外空气参数的影响很小,尾水洞出口空气接近对应尾水温度的饱和状态。Tests the temperature and humidity of outdoor air and outlet air of the tailrace tunnel, the temperature of inlet and outlet water of the tailrace tunnel and the ventilation rate in Yingxiuwan hydropower station. The results indicate that the tailrace tunnel has a good effect on air cooling and dehumidification in summer, and that the parameters of outlet air in the tailrace tunnel are mainly influenced by the temperature of tail water rather than by the parameters of outdoor air and the terminal air parameters are close to the saturated state of the tail water temperature under sufficient tunnel length.

关 键 词:无压尾水洞引风 热湿交换 水电站 现场测试 

分 类 号:TV732.3[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象