检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张吉雄[1] 缪协兴[2] 茅献彪[2] 陈中伟[2]
机构地区:[1]中国矿业大学能源与安全工程学院 [2]中国矿业大学理学院,江苏徐州221008
出 处:《岩石力学与工程学报》2007年第A01期2687-2693,共7页Chinese Journal of Rock Mechanics and Engineering
基 金:国家自然科学基金重大项目(50490273);国家杰出青年科学基金资助项目(50225414);中国矿业大学青年科研基金项目(OA4453)
摘 要:针对建下条采煤柱回收和井下矸石处理的重大技术难题,提出矸石置换开采。通过阐述矸石充填巷集中与分散布置对地表移动的影响、分析置换开采留设煤柱的合理宽度,最终确定在条采煤柱中央集中布置2条矸石充填巷,充填巷尺寸为4.0 m×5.0 m(宽×高)、巷间煤柱宽4.0 m;基于数值模拟方法分析置换开采留设煤柱的稳定性、条采与置换开采老顶层面上垂直应力分布,得出置换开采留设煤柱满足煤柱强度设计要求、基本顶岩层结构保持稳定的结论。并运用相关的力学理论,分析置换开采后顶板的运动和变形特征,得出基本顶不会破断,地表变形没有超过建筑物允许变形范围。设计矸石置换开采充填工艺,该研究成果已成功应用于工程实践。In order to solve the technical problems of mining strip extraction coal-pillar and waste disposal,the waste substitution extraction is proposed.By expounding the effect on surface movement while the layout of waste filling roadway is centralized and decentralized with analyzing feasible coal-pillar width of substitution extraction;the layout with two waste filling roadway placed in middle of strip extraction coal-pillar is determined and its width and height are 4.0 m×5.0 m,respectively;and the coal-pillar width between filling roadway is 4.0 m.Based on numerical simulation to analyze the stability of substitution extraction coal-pillar and vertical stress distribution of main roof in strip and substitution extraction,the conclusions with the strength of substitution extraction coal-pillar achieving design requirement and the strata structure of main roof remaining stable are achieved.By using the mechanics theory to analyze the character of roof moving and deformation after coal mining,the conclusion is gotten that the basic roof will not fail.The surface deformation operates within the allowable deformation of building.The research results have been successfully applied to coal mining.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.12.149.233