检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《安徽地质》2007年第3期203-207,共5页Geology of Anhui
摘 要:合肥市生活垃圾处理项目是安徽省内规模最大的垃圾处理填埋场,工程区地质条件复杂,防渗设计要求严苛,经过工程地质水文地质测绘、钻(静)探、取样测试、地球物理勘探、原位测试、水文地质试验等综合手段勘察,取得了科学准确的参数,对建筑物的地基持力层的选择、设计参数、防渗处理等提出了经济合理的结论和建议,为优化设计、节省投资、安全施工奠定了基础,取得了良好的经济效益及社会效益,同时也积累了同类型项目在花岗岩地区复杂地质条件下的水文地质工程地质勘察经验。The project of municipal domestic waste treatment in Hefei is the largest waste landfill site with complex geological condition and rigorous seepage design requirement in Anhui Province. The correct data are obtained through integrated exploration methods, such as: hydrologic geological and engineering geological survey, boring, sampling test, geophysics exploration, in-situ measurement, hydrologic geological test. It provides economic and rational conclusion and suggestion for selection of foundation bearing layer on buildings, design parameters, seepage prevention. It also provides a basis for optimizing design, saving investment, safety construction, and has an economical and social benefit. Meanwhile, it can accumulate experiences about hydrogeology and engineering geology exploration in granite area for the same type project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117