检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《长江科学院院报》2007年第5期31-33,43,共4页Journal of Changjiang River Scientific Research Institute
基 金:国家科技支撑计划课题(2006BAC14B05)
摘 要:英得尔水库于2005年4月28日凌晨坝上溢洪道垮塌,造成右副坝溃坝事件。溃坝前当地曾发生了两次地震。为分析地震对水库溃坝的影响程度,首先运用加卸载响应比理论研究了坝体的全时程加卸载动力响应规律,结果表明大坝在地震中处于稳定状态;然后考虑地震荷载进行结构抗震稳定分析,结果表明地震是加速溢洪道坝段失稳的重要原因。The spillway of Yingdeer Reservoir, located on the dam, was broken down in the morning on April 28,2005, and it was called the right auxiliary-dam collapsing event. Before the dam break, two earthquakes occurred. To analyze the effect of the earthquake on the dam break, the theory of load/unload response ratio (LURR) is used to study the dynamic response law of the dam body. The result shows that the dam was stable in the twice earthquakes. The seismic stability analysis shows that the earthquakes are the main causes to quicken the spillway to break down.
分 类 号:TV697.24[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15