检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]新疆水利水电勘测设计研究院,新疆乌鲁木齐830000
出 处:《水利水电技术》2007年第10期42-44,47,共4页Water Resources and Hydropower Engineering
摘 要:风城高库原设计是粘土心墙坝,由于土料质量和运距较远,在施工阶段副坝改为土工膜中央防渗土石坝。现对设计和施工进行总结,有利于此种坝型的推广。In original design, the dams for Fengcheng Reservoir were all the embankment dams with central clay core. However, the design of the subsidiary dams were modified to be the earth-rockfill dam with central impervious geomembrane during the construction under the consideration of the quality of the filling material and the transportation distance. For which a summarization of the design and construction is made herein for facilitating this kind of dam.
关 键 词:土工膜 防渗设计 副坝 土工膜中央防渗土石坝 风城高库
分 类 号:TV641.253.1[水利工程—水利水电工程] TV245
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.41