检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁大桥局集团天兴洲大桥建设指挥部,湖北武汉430080 [2]中铁大桥局集团第三工程有限公司,广东广州510800
出 处:《桥梁建设》2007年第5期1-5,共5页Bridge Construction
摘 要:采取有效的温控措施,在保证塔柱混凝土质量的前提下加快施工进度,是斜拉桥主塔冬季施工的关键。以武汉天兴洲大桥主塔中塔柱施工为例,介绍主要的温控措施、冬季施工保温材料的应用效果及工期效应。It is key to the concrete construction of pylons of a cable-stayed bridge in winter season to take effective temperature control measures and accelerate construction progress under the condition that the concrete quality of pylon columns can be ensured. With reference to the construction of the middle column of the pylon of Wuhan Tianxingzhou Changjiang River Rail- cum Road Bridge, this paper presents the principal temperature control measures that should be taken, the effect of application of the thermal insulation materials and their influences on the construction time in the concrete construction in winter season.
分 类 号:U443.38[建筑科学—桥梁与隧道工程] U445.43[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28