作 者:陈隽[1] 卢军[1] 阮羚[1] 种芝艺 邹军峰 汪林清
机构地区:[1]湖北省电力试验研究院,武汉市430077 [2]国网直流工程建设有限公司,北京市100005 [3]湖南电力建设监理咨询有限责任公司,长沙市410007
出 处:《电力建设》2007年第11期22-24,共3页Electric Power Construction
摘 要:宜都蔡家冲换流站GIS安装调试期间发现多起设备缺陷。通过交流耐压试验及局部放电测量发现隔离开关绝缘拉杆存在质量缺陷,更换合格绝缘拉杆后试验通过。断路器解体检查及时发现了内部缺陷,避免了事故发生。进行气体泄漏检查时发现多处气室轻微漏气。气体湿度测量发现超过厂家控制标准,需要进行复测。During the installation and testing process of Yidu Caijiachong Converter Station GIS, several device defects are identified. Through AC voltage test and local discharge measurement, separating switch insulation rod quality defects are found, and it passed test after replaced with qualified one. Breaker internal defects are discovered during disassembling examination, which avoids accident. Minor leaks in several gas chambers are found in leak test. Measurement indicates that gas humidity exceeds manufacturer' s limit and requires recheck.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222