检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张大文[1]
机构地区:[1]东北电力设计院,长春市130021
出 处:《电力建设》2007年第11期45-47,51,共4页Electric Power Construction
摘 要:IEC标准考虑高压厂用电源为中性点接地系统,8.2条规定采用瞬时接地故障保护。但是我国高压厂用电源系统大多为不接地系统,故可取消瞬时接地故障保护。关于电动机定子两相接地故障,IEC标准按短路绝热过程和短路热稳定要求来选择电缆截面,偏保守,会增加投资。所以可取消反时限过电流保护,改由热控保护装置切除故障电动机电源,这样可选择较小的电缆截面。另外,易过负荷电动机现有保护方式可以简化,以利控制盘的设备布置。Considering HV auxiliary power supply uses neutral grounding system, Article 8.2 of IEC Standard specified that instantaneous ground fault protection should be used. However, because most HV auxiliary power supplies in China adopt nongrounded system, instantaneous ground fault protection is unnecessary. To motor stator double earth fault, IEC Standard specifies cable cross-section based on short circuit adiabatic process and thermal stability requirements, which is conservative, resulting in higher cost. Therefore, thermal control protection device can replace inverse time over-current protection to shut off motor power supply, so that a smaller sized cable can be used. In addition, current protection for easy to overloaded motors can be simplified, so that the instrument arrangement of the control panel can be facilitated.
分 类 号:TM621.71[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15