检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]湖南科技大学土木工程学院,湖南湘潭411201 [2]贵州省交通规划勘察设计研究院,贵阳550001
出 处:《土工基础》2007年第5期59-61,65,共4页Soil Engineering and Foundation
摘 要:对龙井滑坡的形成原因进行了探讨。滑坡对应路基为深挖路堑段,呈顺倾产状,坡脚临空;坡体内白云岩部分泥化,且受到基岩裂隙水浸泡和风化作用,致使其抗剪强度降低,坡体稳定性下降;人类活动和大气降水则促使滑坡变形进一步发展。利用软件计算了三个断面的剩余下滑力,并提出了治理方案。The slippage of Longjing slope has occurred in course of the construction of highway roadbed. Based on the analysis of the geological condition and character of Longjing slope, the causes of landslide are discussed. The roadbed of landslide is constructed by large-scale slope excavating and along with the lean direction of terrene, which causes the slope to slide along this direction. At the same time, dolomite is mudded partially, dipped in the cranny-water and airslaked, which weakens the strength of the rock and soil and makes the slope instability. The residual drive-down forces of 3 cross-sections are calculated, then the treatments are presented.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229