500-kV compact type over-head line to be constructed in Yunnan  

500-kV compact type over-head line to be constructed in Yunnan

在线阅读下载全文

出  处:《Electricity》2007年第3期7-7,共1页电气(英文版)

摘  要:Boshang-Mojiang Line is the first 500-kV compact type transmission line to be built in high altitude areas of Yunnan Province with a total length of 315 km. The project has now completed its most field routing survey and entered into the stage of designing working drawing. This line and its associated 500-kV Dehong Substation are planned to be finished in 2008.