检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吉刚
机构地区:[1]河南省水利勘测设计研究有限公司,河南郑州450008
出 处:《水力发电》2007年第10期84-85,88,共3页Water Power
摘 要:郑州市郑东新区龙湖规划水面面积为6.08km2,为我国最大的城市人工湖。因其成湖地层主要为细砂,其建设存在开挖施工防渗、成湖后的有限防渗、地下水交换,以及防止周边地区浸没、盐渍化等问题。应用三维渗流有限元法数值模型对龙湖工程施工和运行期防渗方案进行了模拟仿真计算,给出了工程区地下水位、渗漏量、渗透坡降、渗流场的变化以及优化防渗方案。The planned water surface area of the dragon lake, which is the largest urban artificial lake of china, is 6.08 km^2 in Zhengdong New District of Zhengzhou city. The mainly formed stratum of the lake is fine sand, so the existed problem are seepage control during construction, limited seepage control after completion, exchange of groundwater, and prevention of immersion and salinization in the border area. Numerical model is applied in the analog emulation computation of seepage control program during the construction period and operating period of the dragon lake project by 3D finite element method, so that the change of potential energy of groundwater, leakage, seepage slope, seepage field and the optimized seepage control program are acquired within the engineering construction area.
关 键 词:渗流控制 混凝土防渗墙 人工深水湖 三维渗流 仿真分析
分 类 号:TV876[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.236