巴家嘴水库泥沙淤积与综合治理措施  被引量:3

Sediment Deposit of Bajiazui Reservoir and the Comprehensive Treatment Measures

在线阅读下载全文

作  者:邓新英 

机构地区:[1]甘肃省庆阳市水务局,甘肃西峰745000

出  处:《水力发电》2007年第10期89-91,共3页Water Power

摘  要:巴家嘴水库建于黄土高原,水库泥沙淤积严重。通过对上游流域水沙配置、水库淤积特点、水库运行方式的研究,认为应该采取上游拦沙(水土保持)、修建上游水库与巴家嘴水库联合运行进行调水调沙、库区泥沙治理(河槽疏浚)等综合处理措施,以确保水库能长期稳定地发挥效益。Bajiazui reservoir was constructed in loess plateau. The sediment has been silted up in the reservoir seriously. Based on the study on water and silt arrangement in the upstream reservoir, the reservoir silting-up characteristics and the operation way of reservoir, it is considered that the comprehensive treatment measures should be taken such as the adoption of blocking silt at upstream, constructing upstream reservoir in order to make conjunctive use with the Bajiazui Reservoir, and treating the sediment in the reservoir area, in order to ensure the benefit of reservoir to be stably produced,

关 键 词:水库 泥沙 淤积 综合治理 巴家嘴水库 

分 类 号:TV697.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象