十三陵抽水蓄能电站地下厂房结构动力分析  被引量:21

Dynamically structural analysis of underground powerhouse for Shisanling Pumped Storage Power Station

在线阅读下载全文

作  者:韩芳[1] 蔡元奇[1] 朱以文[1] 

机构地区:[1]武汉大学土木建筑工程学院,湖北武汉430072

出  处:《武汉大学学报(工学版)》2007年第5期91-94,共4页Engineering Journal of Wuhan University

基  金:国家电力公司科技项目(编号:KJ00-03-26-0)

摘  要:以十三陵抽水蓄能电站地下厂房为原型,对其不同的结构形式作了动力分析研究,指出这类厂房结构的减振设计的有效措施是加强楼板的约束和提高楼板的法向刚度;由于机墩刚度较大,因此机墩局部削弱的不同拆卸方案对整个结构的动力特性影响不大;而中拆方案对机墩的刚度削弱最大,对减振设计最为不利.Dynamical property and response of the underground powerhouse of Shisanling Pumped Storage Power Station is studied for its different structural patterns. The results indicate that the best way to reduce the vibration of the powerhouse is to reinforce its restriction of the floor and enhance its normal rigidity. The partial weakening of the generator frustum have no much effect on the dynamical property for its large rigidity; on the contrary, the way to disassemble from the middle will be the most disadvantageous for the earthquake control.

关 键 词:动力特性 地下厂房 拆卸方案 动力设计和优化 抽水蓄能电站 

分 类 号:TV743[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象