检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国建筑科学研究院建筑结构研究所,北京100013 [2]核工业第二研究设计院,北京100840
出 处:《建筑科学》2007年第11期29-34,共6页Building Science
摘 要:预应力包钢加固法是在混凝土构件四周包以型钢,采用高强螺栓对外包钢施加双向水平预应力的一种先进的加固新技术。本文主要介绍了四个梁柱节点试件在周期反复荷载作用下的试验,试验结果表明:采用预应力包钢法加固梁柱节点,可有效提高其开裂荷载、受剪承载力和延性;加固螺栓箍可以有效参与工作,没有应力滞后现象。在此基础之上,本文提出了预应力包钢法加固框架梁柱节点受剪承载力计算公式以及相关的设计建议,为工程实践提供依据。The strengthened method using profile steel and prestressed bolts refers to a new advanced strengthening way in which the concrete beam-column joint is strengthened around its section by bonding profile steel and prestress is applied by high-tensile bolts. The experiment of four beam-column joints under reversed cyclic loading is mainly introduced. The test results show that the crack resistance, shear capacity and ductility of the strengthened beam-column joints are increased effectively. The prestressed bolts can be brought into full play effectively. Based on those, the formula for calculating shear capacity of the beam-column joints strengthened by the new method and related design suggestions are proposed, which can provide scientific basis for engineering practice.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3