检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王谊[1] 吕永明[1] 常万军[1] 吕宏飞[1]
机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021
出 处:《东北水利水电》2007年第11期6-7,共2页Water Resources & Hydropower of Northeast China
摘 要:白山水电站枢纽工程分一、二、三期,一期枢纽由三心圆重力拱坝及右岸发电系统组成,总容量900MW;二期工程为左岸发电系统,总容量600MW;三期为抽水蓄能电站,总容量300MW。一期、二期已建成运行多年,三期工程已完工投入运行。The Baishan water power station is composed by the first stage,the second stage and the three stage projects.The first stage complex is composed by gravity-arch dam with three circle centres and power generation system in right bank with installed capacity of 900 MW.The second stage project is situated in left bank,the installed capacity is 600 MW.The three stage project is the pumped storage power station with installated capacity of 300 MW.The first stage and the second stage projects put into operation in many years.The three stage project is accomplished and put into operation.
分 类 号:TV222[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222