检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黄河勘测规划设计有限公司,河南郑州450003
出 处:《人民黄河》2007年第10期9-10,13,共3页Yellow River
摘 要:南水北调西线工程通过向黄河河道内配置部分水量,进入黄河干流的水沙调控体系,经干流水库的联合调度,进行全河调水调沙,可塑造协调的水沙过程。由水量配置方案,利用建立的输沙关系推算相应的设计沙量,结果表明:按西线调水向河道内配置水量35亿m3,宁蒙河道、小北干流河道和黄河下游河道分别减淤为0.35亿、0.30亿t和0.27亿t。Through allocating partial flow to the Yellow River and joining the flow and sediment regulation and control system of the main river,the West Route of South North Water Transfer Project can create balanced silt-discharge process through integrated regulation of reservoirs on the main river and a regulated discharge regime of the river.It calculates the relevant designed sediment by using the established sediment transport relations based on a water allocation plan.The results show that if the allocated water from the project is 3.5 billion m3,the sediment reduction in Ning-Mong section,Xiaobeigangliu and the lower Yellow River will be 35 million,30 million and 27 million tons respectively.
关 键 词:南水北调西线工程 水沙调控体系 河道减淤 黄河干流
分 类 号:TV851[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.196.9