检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《工程力学》2007年第11期82-87,157,共7页Engineering Mechanics
摘 要:结合土钉支护的施工特点和受力规律,定义施工阶段土体开挖时滑动趋势最大的面为开挖影响面,定义以开挖影响面为边界的土块体作用在支护体系上由土钉承担的力为开挖土压力。通过开挖阶段相邻两步的开挖土压力求出土钉支护因开挖而产生的不平衡力,同时考虑保持土体稳定所需要的抗滑力后可得到开挖阶段土钉轴力。首先分析开挖影响面和开挖土压力及其影响因素,然后给出开挖阶段计算土钉轴力的具体方法,并给出与法国CLOUTERRE项目1号墙足尺试验中土钉力测试值的比较。Based on the constructional feature of soil nailing, concepts defining a family of EIS Excavation Influential Surface (the most likely slip surface when the latest excavation surface remains temporarily unsupported and the nails are not yet installed) and EEP Excavation Earth Pressure (the earth pressure that the soil body from the concrete face to the EIS act on the retaining structure) are proposed. The EEP of (il)^th excavation phase subtracted from the ones of the ith phase gives the unbalanced forces during the i^th construction step. The unbalanced forces will be balanced by the nails. And taking into consideration of the nails' contribution to the slope stability, nail tensile forces will be induced. This paper focuses on the EIS and the method to calculate the soil nail forces where the simple linear wedge EIS is used. By means of the method, we can estimate the location and magnitude of the maximum nail tensile forces during construction. The calculated nail forces for Experiment 1 of CLOUTERRE Research Project by this method agree fairly well with the experiment data.
关 键 词:基坑工程 土钉支护 开挖影响面 开挖土压力 土钉力
分 类 号:TU942[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49