检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]重庆大学建设管理与房地产学院,重庆400045
出 处:《重庆建筑大学学报》2007年第1期110-113,共4页Journal of Chongqing Jianzhu University
摘 要:工程项目投资成为推动我国经济快速发展的重要因素。无标底招标是工程项目投资日益规范的体现。在无标底招标试行的几年里,串标、低于成本价投标的现象时有发生,损害了业主的利益。从产生这些问题的根源——业主和承包商之间的委托代理关系失灵出发,提出了解决这些问题的一些措施:建立系统、科学的资格预审体系、合理判断串标和低于成本价中标的行为以及提供工程担保,希望有利于无标底招标的推行。Investment on construction projects has become an important factor in improving the development of economy in China. The non -price bottom bidding is a representation that the investment on projects is becoming standardized. During the years of trying out the non - price bottom bidding, the colluding in bidding or bidding below the cost has happened several times, which have damaged the benefits of owners. To solve theses problems, this paper firstly studies the root of these problems the failure in the normal relationship between principal and agent. Then, some measures have been presented as follows: building systematic and scientific system of qualification prejudication, judging behaviors of colluding in bidding and bidding below the cost with reason and providing a surety mechanism of the project. The authors hope that these measures are beneficial to non -price bottom bidding.
分 类 号:TU723.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.69