作 者:刘晓瑞[1] 彭开军[1] 高进强[1] 陈宏明[1] LIU Xiao-rui,PENG Kai-jun, GAO Jin-qiang, CHEN Hong-ming (Central China Electric Power Design Institute, Wuhan 430071, China)
机构地区:[1]中南电力设计院,武汉430071
出 处:《电网与水力发电进展》2007年第7期14-17,共4页
摘 要:从高抗的功能、无功补偿及过电压限制对1000kV高抗运行方式的要求,现有500kV高抗的设计、运行、试验的情况以及取消1000kV高抗回路隔离开关对占地及投资的影响等方面对1000kV高抗回路的接线设计进行优化,结果表明,1000kV变电站取消隔离开关,可以大量节约占地和投资,是可行的。As one of the most important equipment in UHV stations, the shunt reactor is vital to the safety and stability of the power system. According to studies on the function of the shunt reactor,operation requirements for the 1000kV shunt reactor in terms of reactive power compensation and over-voltage restriction, and with consideration to the existing 500kV shunt reactor with regard to its design, operation, testing and occupied areas, as well as the investment effect for canceling the disconnector of the shunt reactor,the connection of the 1000kV shunt reactor circuit is optimized. The result shows it is feasible to cancel disconnector for 1000 kV substations, and it can save occupied areas and investment.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222