检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]宁夏电力设计院,银川市750001 [2]宁夏电力调度中心,银川市750001
出 处:《宁夏电力》2007年第A01期37-40,50,共5页Ningxia Electric Power
摘 要:大容量发电机组在电力系统中的投运,提高了系统的充裕度水平、系统供电可靠性水平及资源的利用效率,但对于系统的正常运行也产生了重大冲击。本文分析了大容量机组并网时,对于系统暂态稳定的影响,同时分析了关键潮流断面的功率传送能力对于机组窝出力水平的影响,并给出了相应的解决方案,显著提高了断面的稳定水平,降低了机组的窝出力情况,最后用一个实际算例说明了大机组并网时系统运行及机组窝出力情况。Operation of large-power units in power system, improves its adequacy level, reliability and the energy utilization efficiency. On the other hand, there are also serious impacts on system operation. The influence on transient stability of power system is discussed when large-power units are put into operation. Besides, influence on units' derated output, owed to transfer ability of critical power-flow section, is also analyzed and some advice is presented to improve the transfer ability of critical section. At last, an actual example is given to illustrate system operation and the units' derated output when large-power units are put into operation.
分 类 号:TM712[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28