多阶段再制造逆向物流网络中选址问题研究  被引量:1

Research on multistage location problem of remanufacturing industry reverse logistics networks

在线阅读下载全文

作  者:陆立娟[1] 李大卫[1] 

机构地区:[1]辽宁科技大学理学院,鞍山114044

出  处:《机械设计与制造》2007年第12期212-214,共3页Machinery Design & Manufacture

基  金:辽宁省教育厅高等学校科学研究项目(05L008)

摘  要:在再制造逆向物流中,回收/拆解中心管理是企业逆向物流系统高品质运作的基础和前提。随着逆向物流的发展,企业开始关注回收/拆解中心的选址。针对已有模型没有考虑时间变化对选址决策的影响问题,构建一个双向物流共享运输网络的多阶段选址模型,提出了应用动态规划的求解思想和方法并结合实例分析了在考虑时间因素时,企业如何做出规划期内选址决策的时间序列。The management of reimbursement/disassemble center in the remanufacturing industry reverse logistics is a foundation for the company.With the development of the reverse logistics,corporations concern more and more about the location of reimbursement/disassemble center.Many models are used to solve the location problem, but most of them are stationary models, in which time factors are not considered.It develops a dynamic location model on logistics system and reverse logistics network,applies dynamic programming method to a case and analyses how to make a location decision during a company's planning horizon.

关 键 词:逆向物流 再制造 选址问题 动态规划 

分 类 号:TH16[机械工程—机械制造及自动化] TP27[自动化与计算机技术—检测技术与自动化装置]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象