检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:左萌[1]
机构地区:[1]广东省电力设计研究院水务部,广东广州510600
出 处:《广东化工》2007年第12期100-102,111,共4页Guangdong Chemical Industry
摘 要:针对湛江奥里油发电厂的工程特点,对凝结水精处理系统工艺采用了前置过滤除铁+混床的处理方式,确保电厂启动和正常运行时凝结水的水质达标。离子交换树脂再生采用了英国KENNICOTT公司先进的"锥体分离"体外再生方式,在保证机组运行安全的同时,确保了树脂分离的效率。该工程的精处理设备布置也具有很强的特点,有一定借鉴价值。In accordance with the characteristics of Zhanjiang Ao Li You power plant, condensate polishing plant was designed as Ultipleat Highflow Filter + Mix Bed to insure the condensate qualified during start-up and normal operation. Conesep R was adopted for resin regeneration. This advanced regenerating method insured boiler and turbine security as well as the resin separating efficiency. Layout of condensate polishing equipment was particular designed which could be used for reference of similar plants.
分 类 号:TM621.8[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3