拉西瓦水电站混凝土双曲高拱坝坝基开挖  被引量:4

Foundation Excavation of High Double-curvature Arch Dam of Laxiwa Hydropower Station

在线阅读下载全文

作  者:董彬[1] 侯先廷 王裕彪 

机构地区:[1]黄河上游水电开发有限责任公司拉西瓦建设分公司,青海贵德811700 [2]中国水利水电第四工程局第一分局,青海贵德811700

出  处:《水力发电》2007年第11期59-60,共2页Water Power

摘  要:拉西瓦水电站位于高地应力区,为减少坝基开挖后的卸荷回弹,结合实际地质情况,通过对坝基开挖施工工艺的研究、探索,总结出一套有针对性的施工方法及施工工艺,有效地解决了高地应力区的坝基开挖问题,避免了坝基开挖的二次处理,加快了施工进度,提高了经济效益,可供类似工程地基开挖参考。Laxiwa Hydropower Station is situated on an area with high terrestrial stress. In order to reduce unloaded elasticity after the excavation of dam foundation, in combination with the actual geological conditions and based on the research and exploration of excavation of dam foundation, a set of effective construction method and construction techniques were summarized, which solves effectively dam foundation excavation in the region with high terrestrial stress, avoids secondary treatment of dam foundation excavation, accelerates the progress of construction and increases economic benefits.

关 键 词:高地应力区 坝基开挖 施工技术 拉西瓦水电站 

分 类 号:TV642.42[水利工程—水利水电工程] TU751.2[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象