葛南直流输电系统2006年运行及异常情况总结  被引量:4

Operational Situation and Principal Abnormal Circumstance of ±500 kV HVDC Power Transmission System from Gezhouba to Nanqiao in 2006

在线阅读下载全文

作  者:刘云[1] 李凤祁[1] 王明新[1] 曾南超[1] 王晶芳[1] 李新年[1] 

机构地区:[1]中国电力科学研究院,北京市海淀区100085

出  处:《电网技术》2007年第24期7-11,共5页Power System Technology

摘  要:葛(洲坝)—南(桥)直流输电系统是首次由我国自主完成控制保护系统改造的±500 kV长距离、大容量和超高压直流输电工程。统计了葛南直流输电系统2006年的主要运行指标,分析了运行中发生的原因较为复杂且具有代表性的多项事件,并提出相应的对策和建议。这些经验同样适用于其他高压直流输电系统,有助于提升我国高压直流输电工程的设计、调试和运行水平。±500 kV HVDC power transmission project from Gezhouba to Nanqiao is the first long-distance, large-capacity and high-voltage HVDC project whose control & protection system had been retrofitted solely by the domestic technical force. In this paper the statistics of main operational indices of ±500 kV Gezhouba-Nanqiao HVDC power transmission system in the year of 2006 are presented. The representative accidents triggered off by complex causes during its operation are analyzed, and corresponding countermeasures and suggestions are proposed. These operation experiences are suitable to other HVDC power transmission systems as well and contribute to further improve the design, commissioning and operation level of HVDC power transmission projects in China.

关 键 词:高压直流输电 运行指标 故障及异常 换相失败 葛南直流 

分 类 号:TM721.1[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象