葛洲坝电站170MW机组推力轴承改造  被引量:2

Improvement of Thrust Bearing of the 170 MW Unit in Gezhouba Hydropower Station

在线阅读下载全文

作  者:李泽彦[1] 胡成学[1] 陆明[1] 秦岩平[1] 

机构地区:[1]中国长江电力股份有限公司检修厂,湖北宜昌443002

出  处:《水电能源科学》2007年第6期113-115,共3页Water Resources and Power

摘  要:针对葛洲坝电站#1、#2水轮发电机组推力轴承长期运行中存在的安全运行隐患,为提高机组安全可靠稳定运行对#1机组的平衡块式推力轴承进行了改造,采用弹性油箱托盘支柱式推力轴承。运行结果,推力轴承瓦温、油温稳定,实践表明170 MW机组推力轴承改造是成功的、可行的。Aiming at the safety hidden trouble of thrust bearing for Gezhouba hydro plant ^# l and ^#2 unit in long period operation, it is replaced by the elastic oil sump shoring thrust bearing in order to improve unit's safety and reliability of operation. The operation results show that temperatures of thrust bearing pads and oil are stable. So it proved that the improvement of 170MW unit's thrust bearing is successful and feasible

关 键 词:水轮发电机 推力轴承 平衡块 弹性油箱 改造 

分 类 号:TK730.8[交通运输工程—轮机工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象