检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黄河水利委员会总工程师办公室,河南郑州450003 [2]黄河水利委员会新闻宣传出版中心,河南郑州450003
出 处:《人民黄河》2007年第12期10-11,共2页Yellow River
摘 要:分析了黄河下游二级悬河的形势,针对二级悬河治理的必要性和紧迫性,提出治理二级悬河应坚持全面规划、统筹兼顾、远近结合、标本兼治、综合治理的原则,主要措施包括:①加快建设二级悬河严重河段堤防的加固和防护工程;②破除生产堤等行洪障碍,利用大洪水淤滩刷槽;③利用中常洪水引洪淤滩;④人工疏浚河槽,淤填堤河,淤堵串沟;⑤结合引黄沉沙淤填堤河洼地。近期应做好规划、开展试点、加强相关研究工作。It analyzes the situation and origin of the secondary elevated river on the lower Yellow River and puts forward the principles of overall planning,unified planning with due consideration for all concerned,combining short-term and long-term plans together,treating a disease by looking into both its root cause and symptoms and conducting integrated management according to the necessity and urgency of the secondary elevated river harnessing.The main measures include a) to speed up the consolidation and protection works of serious secondary elevated river section;b) to clear away the obstacles for flooding including production dykes and fill floodplain and scour channel by major floods;c) to divert floods for filling floodplains by normal floods;d) to dredge channel,silt-up borrow bits and block branches manually and;e) to fill-up low-lying areas near the embankment combining with the works of the Yellow River diversion and desanding.It should conduct planning and pilot work and strengthen relevant studies in the near future.
分 类 号:TV85[水利工程—水利水电工程] TV8
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.146