检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长沙理工大学电气与信息工程学院,湖南长沙410076
出 处:《现代电力》2007年第6期76-79,共4页Modern Electric Power
摘 要:在改进单亲遗传算法的基础上,以火电机组运行费用最小化为目标函数,提出了求解方法。模型中计入了水电机组的发电流量、净水头和输出功率间的非线性关系,以及水电系统中多级水库的水流延迟等因素。算例仿真计算的结果表明该方法求解精度高、收敛速度快,进一步验证了算法的正确性和有效性。Based on improvement in the partheno-genetic algorithm (PGA), a solution technique on minimizing the operation cost of thermal units in a hydrothermal power system is presented. Hydrogenerator with a nonlinear relationship of water discharge rate, net head and powe generation is considered. The water transport delay between connected reservoirs in a multi-reservoir cascaded hydroelectric system is taken into account. The simulation results show that the high precision solution and fast convergence speed are obtained in this algorithm, which proves the correctness and validity of the algorithm.
关 键 词:水火电力系统 水电调峰法 变步长搜索法 经济 调度 单亲遗传算法
分 类 号:TM734[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3