多档连续整体装配式架线方法  被引量:5

Multi-span Continuous Integral Assembling Stringing Technology

在线阅读下载全文

作  者:黄成云[1] 黄朝永[1] 崔青松[1] 张宏志[2] 

机构地区:[1]安徽送变电工程公司,合肥市230022 [2]安徽省电力公司,合肥市230022

出  处:《电力建设》2008年第1期34-35,共2页Electric Power Construction

摘  要:特高压直流试验基地工程是为关键性技术、环境影响、绝缘特性、无线电干扰等方面提供试验研究的第1个特高压直流试验基地。试验基地线路段门型直线塔采用悬垂耐张串的方式,根据设计特点和现场施工场地情况,因工期紧张,对张力架线、分档装配式架线、多档连续整体装配式架线方式进行比较,决定选用多档连续整体装配式架线方案,保证了工期,导线保护措施收到了良好效果。The UHV DC testing site is the first testing site for experimental studies in key enabling technologies, environmental influences, insulation, radio interferences, etc. The ? -shaped suspension tower of testing line uses suspended strained insulator strings. According to design features and construction site conditions, by comparing stringing, single span assembling and multi-span continuous integral assembling methods, the multi-span continuous integral assembling method is chosen so that the schedule is met and conductor protective measures are effective.

关 键 词:特高压直流试验基地 多档 连续 整体 装配式架线 

分 类 号:TM752[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象