检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张鸿琴[1] 孙保平[1] 贺威[1] 李小侠[1]
机构地区:[1]中国水电顾问集团西北勘测设计研究院,西安710065
出 处:《西北水电》2007年第4期40-44,共5页Northwest Hydropower
摘 要:鲁地拉水电站采用五表孔集中布置、两底孔分列两侧的孔口布置方案,表孔采用"X"型宽尾墩+台阶堰面+戽式消力池的联合消能方式,是目前中国采用这种联合消能型式的工程中坝高最大的水电站;底孔采用长泄道挑流消能方式。通过模型试验验证,鲁地拉泄洪建筑物的布置型式较好地适应了坝址的地形地质条件,能够满足泄洪消能要求,消能效果良好。The scheme is arranged for Ludila hydropower project, with concentrated five surface orifices and two bootom oulets at both sides. The compound energy dissipator is applied for surface orifices, with "X" shaped flaring pier plus step weir surface plus bucket basin, and is adopted for the project with the highest dam in China for the time being. The long - sluicing ski jump energy dissipation is used for bottom outlets. Through hydraulic model tests, the arrangement of structures adapts to landform and geological conditions, and can satisfy the requirements of energy dissipator for flood discharge, which has achieved good effect of energy dissipator.
关 键 词:鲁地拉水电站 X型宽尾墩 台阶坝面 戽式消力池 水工模型试验
分 类 号:TV653[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249