小湾水电站左岸混凝土拌和系统设计  

Design of concrete mixing plant on left bank for Xiaowan hydropower project

在线阅读下载全文

作  者:关薇[1] 康智明[1] 杨志尧[1] 

机构地区:[1]中国水电顾问集团西北勘测设计研究院,西安710065

出  处:《西北水电》2007年第4期45-48,共4页Northwest Hydropower

摘  要:澜沧江小湾水电站左岸混凝土拌和系统布置在2—4号山梁高边坡地段,场地狭窄,系统规模、设计难度大。文章结合场地条件,对系统的工艺设计流程、建筑物的布置、胶凝材料下送试验等进行了介绍,并对系统设计的难点、特点做了详细的论述,为以后类似的设计项目提供一些借鉴经验。The concrete mixing plant on left bank for Xiaowan hydropower project located on Lancangjiang River is arranged on the high slope terrain of No. 2 - No. 4 mountain ridges, with narrow area, large - scale system and big degree of difficulty. In light of site condition, technological design process of the plant, layout of structures, delivery test of cemented material are presented are presented, and the difficulty and feature of the plant design are elaborated, in order to provide some experiences for reference for similar projects in future.

关 键 词:小湾水电站 混凝土拌和系统 胶凝材料 设计特点 

分 类 号:TV536[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象