检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团西北勘测设计研究院,西安710065
出 处:《西北水电》2007年第4期45-48,共4页Northwest Hydropower
摘 要:澜沧江小湾水电站左岸混凝土拌和系统布置在2—4号山梁高边坡地段,场地狭窄,系统规模、设计难度大。文章结合场地条件,对系统的工艺设计流程、建筑物的布置、胶凝材料下送试验等进行了介绍,并对系统设计的难点、特点做了详细的论述,为以后类似的设计项目提供一些借鉴经验。The concrete mixing plant on left bank for Xiaowan hydropower project located on Lancangjiang River is arranged on the high slope terrain of No. 2 - No. 4 mountain ridges, with narrow area, large - scale system and big degree of difficulty. In light of site condition, technological design process of the plant, layout of structures, delivery test of cemented material are presented are presented, and the difficulty and feature of the plant design are elaborated, in order to provide some experiences for reference for similar projects in future.
分 类 号:TV536[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15