检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团西北勘测设计研究院,西安710065 [2]黄河拉西瓦水电站葛洲坝集团公司西北分公司,青海省贵德县811700
出 处:《西北水电》2007年第4期55-58,共4页Northwest Hydropower
摘 要:为了解决上游围堰防渗及绕坝渗漏问题,确定最优防渗方案,对炳灵水电站右岸松动体防渗帷幕的防渗方案进行了三维有限元渗流计算,并对右岸松动体帷幕的防渗范围和灌浆排数进行了敏感性分析。通过多种防渗方案的计算,对右岸松动体的防渗方案做了相应优化,建议了满足设计要求的防渗方案。For the sake of solving seepage control of the upper cofferdam and leakage around the dam and determining optimum anti - seepage scheme, it was proposed to executed the three - dimensional seepage calculation on impervious curtain of the loose body on left bank for Bingling hydropower project, and to make the sensitivity analyses of anti - seepage range and rows of grouting as well. By calculation of various anti - seepage schemes, relative optimization was performed for the loose body on right bank in the seepage control scheme. That has satisfied design requirements of seepage control.
分 类 号:TV551.31[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3