检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《隧道建设》2007年第6期19-21,共3页Tunnel Construction
基 金:国家高技术研究发展(863计划)专项经费资助项目(课题编号:2006AA11Z116)
摘 要:盾构设备配置是否合理是关系到工程建设成败、工程进度、工程投资的重要因素。在成都砂卵石地层中建设地铁,要求盾构设备能够实现砂卵石地层的长距离掘进、大漂石和卵石的破碎以及防止喷涌的发生。根据这些要求,阐述了某加泥式土压平衡盾构机的基本设备参数,并对其功能进行了分析,同时对设备配置中的顶推力参数进行了示例性检算。The equipment configuration of shield machines is one of the important factors that dominate the results, progress and investment of the works. For the construction of the running tunnels of Chengdu Metro in sandy cobble ground, the shield machine is required to have the capability of performing long-distance boring in sandy cobble ground, crushing the large boulders and cobbles and prevention and control of mud bursting. In the paper, the parameters of the basic equipment of a mudding-type EPB shield machine is presented, the functions of the equipment are analyzed and the thrust force parameters are verified.
关 键 词:地铁 加泥式土压平衡盾构机 砂卵石地层 设备配置 顶推力
分 类 号:U455.39[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3