金清挡潮闸混凝土工程病害成因分析及处理措施  被引量:2

Causes and Countermeasures for Tide Lock Concrete Disease of Jinqing Project

在线阅读下载全文

作  者:吴宏平[1] 马福君[1] 

机构地区:[1]浙江水利水电专科学校,浙江杭州310018

出  处:《浙江水利水电专科学校学报》2007年第4期18-21,共4页Journal of Zhejiang Water Conservancy and Hydropower College

摘  要:通过对金清挡潮闸混凝土工程病害检测及分析,得出了沿海挡潮闸的钢筋混凝土结构病害成因主要是混凝土结构的盐污染、混凝土的碳化、钢筋保护层厚度严重不足等因素的综合作用的结果.提出了针对水闸结构的作用特点,根据混凝土构件病害形式及程度,分别采用DL470乳胶配制的水泥砂浆进行修复,采用外帖碳纤维布进行补强加固处理,对存在严重安全隐患的混凝土构件,应进行更换处理.为沿海水工混凝土结构的病害处理提供了科学依据.Based on the detection and study of the tide lock concrete in Jinqing Project, the main disease causes of formation are revealed, which is the result of multi factors such as the chloride pollution of concrete structure, concrete carbonation and serious shortage of reinforcement protective layer thickness. According to the sluice structure characteristics, the disease form and extent of the concrete elements, the cement mortar with DL470 latex is suggested to be. used to repair the concrete components and the carbon fiber is chosen to reinforce the concrete components, while the concrete dements with serious hidden trouble problems should be replaced, which provides a scientific theory on how to handle the concrete structure in coastal area.

关 键 词:水闸 钢筋混凝土结构 检测 病害成因 处理措施 

分 类 号:TV698.22[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象