重庆朝天门长江大桥主桥上部结构设计  被引量:2

Design of Main Bridge Upper Structure for Chongqing Chaotianmen Yangtze River Bridge

在线阅读下载全文

作  者:孟乙民 段雪炜[2] 

机构地区:[1]中交水运规划设计院有限公司,北京100007 [2]中铁大桥勘测设计院有限公司,武汉430050

出  处:《水运工程》2008年第1期25-30,共6页Port & Waterway Engineering

摘  要:随着我国经济实力的增强和桥梁技术水平的提高,特大型桥梁日益增多,桥型也越加丰富,桥梁结构更加合理。文章以重庆朝天门长江大桥为例,就如何选址桥位、确定桥型及在确定的技术标准及荷载条件下如何开展结构设计、考虑施工因素提出设计思路。Accompanying the enhancement of China's economic strength and improvement of bridge construction technique, ultra-large bridges emerge increasingly, bridge types turn richer, and bridge structures become more rational. Taking Chongqing Chaotianmen Yantze River Bridge as an example, we put forward a train of thought for bridge design on choice of bridge site, determination of bridge type, and implementation of structural design and consideration of construction factors under definite technical standard and load condition.

关 键 词:中承式连续钢桁系杆拱桥 桥位 桥型 设计荷载 

分 类 号:U448.224[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象