改进移民安置规划设计 适应新的移民法规政策环境  被引量:2

Improving Resident Resettlement Planning and Design of Hydroelectric Project to Cope with New Policies and Regulations for Resident Resettlement

在线阅读下载全文

作  者:王斌[1] 张一军[1] 彭幼平[1] 

机构地区:[1]中国水电工程顾问集团公司,北京100011

出  处:《水力发电》2007年第12期1-4,共4页Water Power

摘  要:2007年,水力发电工程学会水库经济专业委员会已成立20周年。为此,就水电工程移民安置规划设计历程进行了回顾,对政策法规、设计管理、移民补偿政策、技术标准等方面进行了总结评价。结合贯彻移民条例,从规划设计任务、指导思想、补偿政策、安置方式等方面分析了做好移民安置规划设计工作的调整思路;提出了积极探索创新移民安置方式、严格实物指标调查工作、合理安排设计周期的建议。By 2007, the Reservoir Economy Professional Committee of the Chinese Society for Hydropower Engineering has been in existence for 20 years. So the paper makes a look back on the course of the planning and design resident resettlement of the hydroelectric projects and also a summary and evaluation of it in the aspects of policies, regulations, design management, policies for resettlement and technical standards. In the light of implementation of resettlement regulations, it presents an improved concept for a better resettlement in consideration of the aspects including planning, design, guiding ideologies, compensation policies and resettlement. The paper further proposes that it is necessary to probe actively for creative new resettlement schemes, make strict investigation on material index and a reasonable design cycle.

关 键 词:移民 规划 回顾 法规 水电工程 

分 类 号:C922[社会学—人口学] D922.39[政治法律—法学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象