检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王利卿[1] 马跃先[2] 吴昊[3] 原文林[4]
机构地区:[1]华北水利水电学院水利职业学院,河南郑州450008 [2]郑州大学环境与水利学院,河南郑州450002 [3]黄河勘测规划设计有限公司,河南郑州450003 [4]西安理工大学,陕西西安710048
出 处:《水力发电》2007年第12期38-39,49,共3页Water Power
摘 要:针对阻抗式调压室不能完全反射水电站压力钢管传来的水击波的实际特性,导出了阻抗式调压室的阻抗系数和该处水击波透射系数之间的关系;以水击计算的特征线法为基础,提出了考虑调压室对水击波不完全反射时的水击压强计算方法;实例对比说明,设置阻抗式调压室时,不仅阀门处的水击压力比用常规方法计算的值高,而且引水隧洞也承受着一定的水击压力。In allusion to the characteristic of resistance surge chamber reflecting incompletely water hammer from pressure tube, this paper studied the relation between the coefficient of resistance and the coefficient of pressure transmission. Based on the characteristic method, this paper brought forward a method of calculation about water hammer reflecting incompletely water hammer wave, calculated and analyzed a actual example, the result indicated that the pressure of water hammer in the pressure tube and diversion tube is higher, compared with using the method of calculation about water hammer in throttled surge tanks reflecting completely water wave.
分 类 号:TV732.53[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28