检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]天津大学建筑工程学院
出 处:《水力发电》2007年第12期89-92,共4页Water Power
基 金:国家杰出青年基金项目(50525927);天津大学青年教师基金项目(5110105)
摘 要:混凝土坝下游面钢衬钢筋混凝土管道既是一种新型的布置方式,又是一种新型的结构形式。结合金安桥水电站工程实际,对高地震区混凝土坝下游面钢衬钢筋混凝土管道的结构特性进行了研究,提出了相应的工程措施。研究结果表明,在高地震区采用此种形式的混凝土管道结构上是可行的,只要措施得当,可以确保工程安全。The Penstock laid on downstream face of dam is not only a new type of arrangement, but also a new kind of structure. In accordance with the practice of Jinanqiao Hydropower Station, the aseismatic characteristics of the penstock laid on downstream face of concrete dam in high earthquake area has been studied and some earthquake-protective measures are put forwards. The research results indicate that adopting the penstock laid on downstream face of concrete dam in high earthquake area is feasible. The engineering safety can be guaranteed as long as the engineering measurements are used properly.
关 键 词:坝下游面管道 强度 地震 抗震措施 有限元 金安桥水电站
分 类 号:TV734[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117