检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,湖北武汉430072 [2]国家电力公司昆明勘测设计研究院,云南昆明650061
出 处:《四川大学学报(工程科学版)》2008年第1期51-57,共7页Journal of Sichuan University (Engineering Science Edition)
摘 要:考虑施工期至运行期全过程瞬态温度荷载和水荷载的影响,采用无厚度的接触单元模拟诱导缝的工作性态,分别采用整体模型和子模型对小湾高拱坝坝踵附近诱导缝的设置效果进行了全面、深入分析。从整体仿真计算结果来看,小湾拱坝设上游结构诱导缝后,坝踵应力可以得到较大的改善,且对坝体的整体性影响较小。仿真计算结果为小湾拱坝结构诱导缝设计提供了科学依据。Effect of setting structure joint for Xiaowan high arch dam is discussed considering thermal stress and water loads from construction period to operation period. A no-thickness contact element is presented to simulate structure joint, uniaxial equivalent tensile softening model is adopted as constitutive model of dam concrete. FEM analysis is performed with the whole model and sub-model in this paper. The computation results show that the tensile stress on dam heel is released. Setting structure joint on dam heel has little influence on the whole structure of dam. The results can offer theory references for design of Xiaowan High Arch Dam,
分 类 号:TV641[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.210.36