检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉理工大学硅酸盐材料工程教育部重点试验室,湖北武汉430070 [2]广州珠江黄埔大桥建设有限公司,广东广州510420
出 处:《混凝土》2008年第1期4-6,共3页Concrete
基 金:广东省交通厅科技项目(2006-02)
摘 要:对于移动模架法施工大跨径箱梁的水化温度进行了现场监测,并利用有限元工具ANSYS对其温度场进行了模拟分析。借助于这两种手段考察了移动模架法施工大跨径混凝土箱梁温度和温度梯度的分布与发展规律,分析了温度裂缝容易发生的部位与时间,提出了进行移动模架法施工大跨径混凝土箱梁温控的合理建议。Measurement of the hydration temperature of large span box girder constructed with movable scaffolding system was carried out in site to get the first-hand data.Finite element analysis was also made to get a overal knowledge of the distribution and develoment of both its temperature and temperature gradient over time.By these two means,a judgement about when and where the box girder risks cracks was made. Based on this analysis, we give some proper suggestion on how to control the hydration heat in large span box girder.
分 类 号:TU528.01[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.19