检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《电力需求侧管理》2008年第1期19-21,共3页Power Demand Side Management
摘 要:要建立电力需求侧管理(DSM)工作的长效机制,需要建立一套完善的DSM项目评估价体系,综合考虑各种实际因素对DSM项目评价指标的影响。在传统DSM项目成本效益分析模型的基础上增加了市场渗透率、"免费搭车"、"市场溢出"等因素,建立了上述因素改进后的评估模型算法,并应用实例对改进前后DSM项目评估模型进行了仿真分析,进一步验证了改进后评估模型的可行性和有效性,从而为政府主管部门开展DSM规划和实施工作提供了重要的决策依据。In order to set up a long term DSM mechanism, it is needed to design a perfect DSM project evaluation model and comprehensively consider elements which affect DSM project evaluation index. According to traditional DSM project cost-effective analysis model, the paper adds market penetration,free ride, market overflow to set up new evaluation model algorithm, and uses an example to emulate the effect of the two DSM project evaluation models. So it further verifies the feasibility and effectiveness of the new evaluation model which will provide important dicision accordance for governments to make DSM policies.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49