检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]南京解放军第81医院麻醉科,江苏南京210002
出 处:《实用骨科杂志》2008年第1期27-28,共2页Journal of Practical Orthopaedics
摘 要:目的观察人工关节置换术中充填骨水泥对血液动力学的影响。方法40例ASAⅡ~Ⅲ级行人工关节置换术的患者,观察骨水泥充填后10min内血液动力学的变化。结果充填骨水泥后10min内患者血液动力学都有显著变化(P〈0.05),个别患者血压下降严重。需升压药支持。结论人工关节置换术中充填骨水泥可致血液动力学严重波动,应引起重视。Objective To investigate the effect of acrylic cement implantation on hemodynamics during the artificial joint replacement. Methods Forty ASA Ⅱ-Ⅲ patients scheduled for the artificial joint elective replacement were investigated the changes of hemodynamics after acrylic cement implantation within 10 min. Results Hemodynamic fluctuation was observed within 10 min after insertion of acrylic cement with all patients(P〈0.05),a few patient's blood pressure drops seriously ,need to step up the medicine to maintain. Conclusion The insertion of acrylic cement during the artificial joint replacement can result in a transient and critical hemodynamic fluctuation,more attentions should be paid.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28