作 者:保华富[1] 张永全[1] 忱蓉[1] 李仕胜[1]
机构地区:[1]中国水电顾问集团昆明勘测设计研究院科学研究分院,云南昆明650033
出 处:《水利与建筑工程学报》2008年第1期34-37,共4页Journal of Water Resources and Architectural Engineering
摘 要:结合糯扎渡水电站260 m级高坝心墙防渗料采用风化料及掺砾风化料的现场碾压试验,进行了现场渗透及现场大型直剪试验研究,风化料及掺砾风化料的室内外试验垂直渗透系数和水平渗透系数均小于i×10-5cm/s,两种料的渗透性均满足工程要求。风化料经掺砾后,其抗剪强度得到良好改善,有利于降低高坝建成蓄水后心墙的变形量,使之与堆石的变形协调。The in-situ seepage test and in-situ large direct shear test are made combining with the in-situ rolling test for the core wall of 260 m high dam in Nuozhadu Hydropower Station, the impervious material of which is weathered material or gravel weathered material. The vertical permeability coefficient and horizontal permeability coefficient of the weathered material and gravel weathered material from indoor and outdoor tests are all less than 1×10^-5cm/s, and the permeability of all the two materials meets the needs for the engineering. After admixing with the gravel, the strength of the weathered material is improved favorably to reduce the deformation of the core wall after water storage of the high dam, so as to coordinate into the rockfill.
关 键 词:原位试验 风化料 渗透性 抗剪强度 糯扎渡水电站
分 类 号:TV641.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30