检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海水产大学信息学院,上海200091 [2]燕山大学机械厂,河北秦皇岛066004
出 处:《计算机辅助工程》2007年第4期80-83,共4页Computer Aided Engineering
摘 要:对制造资源计划(Manufacture Resource Planning,MRPII)系统的物料清单(Bill of Materials,BOM)设计与实现过程中BOM的生成方法、多视图映射、数据结构及多层次通用件处理等关键问题进行深入研究.结合某机械加工厂的具体工作实例,给出单层BOM数据结构、多视图映射及低层码处理多层次通用件问题等方案,实现企业BOM管理的信息化,提高工作效率及质量.Several key problems on design and implementation of Bill of Materials (BOM) in Manufacture Resource Planning (MRP Ⅱ) system, such as generating method, multi-view mapping, data structure and process of multi-layer general part, are deeply studied. The resolutions about single-layer BOM data structure, multi-view mapping, processing multi-layer general part by low level code and so on, are proposed combined with the actual situation of a machinery plant. The information management of BOM is realized and the work efficiency and quality are improved.
分 类 号:TP319[自动化与计算机技术—计算机软件与理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3